Bravo B409 Manuale Utente

Navigare online o scaricare Manuale Utente per Pompe d’acqua Bravo B409. Installation Manual Manuale Utente

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 12
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 0
FOR B409 DOUBLEWALL TANK SUMP
WITH REINFORCED BOTTOM
INSTALLATION INSTRUCTIONS
ii-B409-DW-12A
800-AT-BRAVO
WWW.SBRAVO.COM
Use this manual
for the B-830-D-AB
series transition
containment sumps
Vedere la pagina 0
1 2 3 4 5 6 ... 11 12

Sommario

Pagina 1 - INSTALLATION INSTRUCTIONS

FOR B409 DOUBLEWALL TANK SUMPWITH REINFORCED BOTTOMINSTALLATION INSTRUCTIONSii-B409-DW-12A800-AT-BRAVOWWW.SBRAVO.COMUse this manualfor the B-830-D-ABs

Pagina 2

Even though Bravo DoubleWall product corners and edges are thicker than the rest of theContainment sump, These areas recieve the most supceptable to p

Pagina 3 - WARRANTY IS VOID:

E - CONNECTING TO MANOMETERE.1 - At this point, after the ALDP test, the interstice should still be holding vacuum. Maintain 20”of Vacuum and slowly o

Pagina 4 - EQUIPMENT DRY-FIT

12 ii-B409-DW-12AG - Concrete and Backfill Guidelines.To ensure that no immediate or future damage is done to your Bravo Tank Sump Reducercomponents,

Pagina 5

READ THESE INSTRUCTIONS - KEEP FOR FUTURE REFERENCETABLE OF CONTENTSDRY FITTING SUMP & EQUIPMENT...p. 4A) Installing

Pagina 6 - INTEGRITY TEST

3 ii-B409-DW-12AIt is REQUIRED to visually check the Vacuum gauge on eachand every Bravo Systems Double Wall product and write on itsFAX report Vacuum

Pagina 7 - MUST COMPLETE THE

4 ii-B409-DW-12AEQUIPMENT DRY-FIT- BEFORE INSTALLING PENETRATION FITTINGS- BEFORE CUTTING OPEN SUMP INTERSTICEDRY-FIT YOUR SUMP PIECES AND INTERNAL EQ

Pagina 8 - ...SLOWLY open ball valve

A.1 - Visually inspect the parts provided by Bravo Systems for In-transit damage and/or missingparts. Continue to keep the Sump clean of debris throug

Pagina 9 - D) ADVANCED LEAK DETECTION

B - MANDATORY AIRINTEGRITY TESTB.1 - Use test assembly and pressure sump to no morethan 4 PSI. Close off with ball valve and resume other work.Allow 1

Pagina 10 - ALDP IN ACTION DIAGRAM

C - VACUUM / HYDROSTATIC FILLINGFIELD AIR INTEGRITY INSPECTION TEST : YOUR PRODUCT WARRANTY WILL BE VOID IF YOU DO NOT Hold pressurefor a minimum of 1

Pagina 11 - E - CONNECTING TO MANOMETER

8C.3 - Close off ball valve completely andprime the open ended 36” length of clear tubingwith provided Interstitial Fluid. Use a liquid funnel.Filling

Pagina 12 - SAND OR SOIL

D) ADVANCED LEAK DETECTION PROCEDUREA Bravo Systems Exclusive detection methodD.1 -Clear debris from the top open area of the DoubleWall Product and e

Commenti su questo manuale

Nessun commento